品茶论坛

Back to the water company building, the maintenance workers took a hot bath in the company, and Yusi took everyone to a nearby food stall.

It snowed outside in winter.
A dim street lamp, snowflakes flashing with white light and covered with down, a dozen people talked and laughed all the way.
"The new boss is quite good at being a man."
"I heard that after the company reform, it is necessary to assess and divert. I don’t know what is going on?"
Especially in thinking about rubbing hands for a long time, the hands of maintenance workers not only have thick cocoons, but also will be chapped in winter, and the chaps will be covered with fingers and palms.
Ha a sigh of relief "shout … don’t think too much, it’s hard to say that it is impossible for our maintenance team to cancel his department."
"Boss, the maintenance equipment today is quite good."
"indeed"
"There is not a day when the main pipeline is repaired before."
"It may be a new technology."
I went to Qixian Sichuan restaurant and ordered fish with Chinese sauerkraut, spicy chicken, husband and wife lung slices, Sichuan style pork, fried pork with sour beans and so on.
The boss is a big fat man, and Yu Yusi and others are old acquaintances and sent them several dishes of kimchi and spicy radish. Today is not a burst pipe? "
"Just repaired" especially when I picked up a piece of diced radish and sent it to my mouth. There was a hint of sweetness in the crispy sound of bobo.
"Fixed? So soon? "
"New equipment"
Big fat suddenly remembered one thing: "Laoyou’s tap water has improved a lot recently, and the smell of disinfection is not so heavy."
After drinking a mouthful of beer, Yu Si smiled and replied, "The waterworks have reformed new technologies, and the pipes will not be disinfected after renovation."
"Waterworks renovation? I think it is better to build more reservoirs, or there is no water in summer, which is a big trouble. "
"Don’t worry! It won’t be too short of water this year, "especially Yusi casually said.
"Ha-ha, thank you for your good words." Big fat walked over on the surface, but in fact, a hundred people didn’t believe that he had been in Tianshui store for seven years, knowing that it was getting drier every year.
In summer, water is cut off at both ends every three days, or water is limited every day. Last summer, water was cut off in large areas for several weeks.
Even the water passing through the Kuihe River in Tianshui City is getting smaller and smaller, and it was directly exposed to the bottom of the river last year.
In a short time, the food was coming one after another, especially Yusi and others also moved chopsticks, but considering that it was going to repair the road, they didn’t dare to drink it.
Life is a mosaic of broken colored glass, which is as colorful as a mirror and reflects strange people.
This city has a heavy past. It is famous for its water and is declining because of it.
The water purification equipment in the waterworks seems to have replaced Tianshui with a stronger kidney and injected a stream of life water into the city.
In life, residents just feel the change of water quality, but it is hard to imagine that the technology behind it will change their lives.
I don’t know how far the northwest night is from Lebanon. This is a radical era.
Chapter 10 Breeding
Quancheng in Shandong Province
Huang Xiuyuan and his assistant Zhang lei Huang Weichang took the high-speed rail in Beilu Province on January 21.
At present, the largest market of Suiren Company is also the area with the most investment. He, the chairman of the board, should come and inspect it in person.
Lin Baijie will be in Lingnan this Spring Festival, and all branches and companies in Lingnan will inspect and express their condolences.
Huang Xiuyuan’s father and mother expressed their condolences to Rongcheng Branch on his behalf.
Zhao Xiaobing, manager of Shandong Branch, personally took Huang Xiuyuan and others to inspect companies and factories around Shandong Province.
The first inspection project when I came to Rizhao Blue Times Branch was the first phase project of Rizhao seawater desalination plant.
Due to the influence of winter weather in the north, the progress of the factory was delayed. Fortunately, the ground leveling and concrete pouring were completed before there was snow.
At present, the first floor of the main concrete frame structure has been completed, and the second and third floors are steel structures. The weather has little influence on the steel structure construction.
Equipment has also been put in place, and some water purification equipment has been installed and debugged.
The whole Rizhao seawater desalination plant is divided into four areas: potassium salt refining area, water purification area, crude salt area and water purification area.
A huge water pipeline on one side of the water purification area has been constructed for more than one kilometer, and will eventually be extended to three reserve reservoirs 67 kilometers, 17 kilometers and 39 kilometers away from the seawater desalination plant.
In front of here is a saline-alkali land. After the planned construction of a desalination plant, about 24 mu of industrial land has been prepared for future expansion.
"Xiao Bing estimates when Rizhao Factory can be put into operation?"
"If everything goes well, Mr. Huang can be put into operation at the end of February this year."
Huang Xiuyuan then asked, "What about the island city factory and Dongying factory?"
"It’s almost faster in Dongying."
After leaving Rizhao, I went all the way to inspect the cities in Lu and came to Dezhou Branch.
Dezhou cows breeding base
The number of dairy cows in the base fence is soaring with time, and it has reached more than 5 thousand at present